Project: Structural Steel / Architectural Metalwork

Sector: Commercial offices

Client: Northvale Construction Ltd

Project outline

‘Keen House’ is a detached two storey office building totalling almost 40,000 sq ft. BM Steel Fabrications was contracted by Northvale Construction to supply structural steel to install a new mezzanine floor within the existing building which was undergoing extensive refurbishment.

BM Steel was also contracted to remove an existing brise soleil from the front façade of the building, disassembling piece by piece to reveal the glass façade below.

BM Steel completed the manufacture and installation of a new flight of stairs in the building, as well as railings on the landings. All work was completed on time and on budget, to the customer’s satisfaction.