Project:

Mare St

Sector:

Residential

Client:

Talina Builders

Project Background

Working with London based Talina Builders, BM Steel Fabrications supplied 12 tonnes of structural steel with galvanised finish for this unusual project. The mechanised first floor infill walkway between two buildings can be raised and lowered as necessary to allow access large heavy goods vehicles to a rear car park

Key Points

  • 12 tonnes structural steel
  • Galvanised finish
  • Supply and delivery
  • Infill walkway between two residential buildings
  • 3-1
  • 3
Back